Exam-style question
Try this first
A software developer is preparing to test a new data entry system before deployment. The developer creates a test plan including normal, abnormal, and extreme test data to check input validation and output formats.
Method
Testing Method for Data Entry System
The developer will enter different types of test data into the system, record the actual output, compare it with the expected output, and note any discrepancies. If errors are found, corrective actions will be taken and retesting performed.
| Step | Description |
|---|---|
| 1 | Prepare test data sets (normal, abnormal, extreme) |
| 2 | Input test data into the system |
| 3 | Record actual output |
| 4 | Compare actual output with expected output |
| 5 | Identify errors and take corrective measures |
| 6 | Retest corrected parts |
- a[1]
Identify the independent variable in this testing method.
Aim for approximately 1 distinct marking point.
- b[2]
Describe how the developer ensures the reliability of the test results.
Aim for approximately 2 distinct marking points.
- c[1]
Suggest one improvement to increase the accuracy of the testing method.
Aim for approximately 1 distinct marking point.
0 of 3 parts answered
Answer every part before opening the mark scheme.
Concise answer preview
Concise answer
The independent variable is the type of test data used (normal, abnormal, extreme).
Why this is correct
The independent variable is what the tester changes, which is the type of test data entered.
Complete every part above to unlock the full mark scheme through the existing protected review flow.
Common mistake
No common mistake is linked to this question yet.
